Cleaning for builders, developers and renovators

When the trades have finished, we clean the property so it is ready to hand over, at a price you see before you book.

A newly fitted kitchen still wrapped in protective plastic and paper after renovation work

What we do for you

Done by our own trained team, with professional equipment.

  • Fine building dust removed from every surface, high to low
  • Inside every cupboard, drawer and wardrobe
  • Paint splashes, cement haze and adhesive removed with care for the finish
  • Protective film and stickers taken off windows and appliances
  • Windows, frames, tracks, bathrooms, kitchen and floors
  • A deep clean or window cleaning before handover

From building site to handover

The trades have gone and every surface is under fine grey dust, with paint on the glass and cement haze on the tiles. Builders, developers and renovators across Mauritius book MOMO D’ECLAT at the end of a job. That way the property can be handed over and lived in or worked in.

Why building dust needs its own clean

Building dust is finer than household dust. Plaster, cement and sanding dust hang in the air long after the work stops. Then they settle on every surface, inside cupboards, in light fittings and in air conditioning vents. A shelf wiped once can be dusty again the next day.

The other difference is residue. A post construction clean removes things that were meant to stick: paint, grout, silicone, adhesive and labels. Each needs the right method for the surface, because the wrong one can damage a brand new finish.

What the clean covers

  • fine dust from ceilings, walls, light fittings and ceiling fans
  • inside every cupboard, drawer and wardrobe
  • windows, frames, sills and sliding door tracks, with the protective film and stickers removed
  • paint splashes on glass, tiles, fittings and switches
  • cement and grout haze on tiles
  • kitchen units and appliances, inside and out
  • bathrooms, including taps, glass screens and the silicone lines
  • doors, handles, skirting boards, sockets and the floors

The kitchen is included. The garden is not. A terrace, balcony, garage, pavement or backyard can be added at a fixed price.

The order of work

Dust falls, so the work goes from top to bottom and from the back of the property towards the door. Everything is dry dusted first, high to low, with a vacuum fitted with a fine filter. Wiping wet first would turn fine dust into a paste. Then every surface is wiped with clean cloths, changed often. The residues come off surface by surface, and the floors are cleaned last, then again once the dust has settled.

Care for new finishes

  • Paint on glass comes off with a glass scraper held flat on wet glass, tested on a corner first, because coated or toughened glass scratches.
  • Cement haze needs a product matched to the tile. Acid based cleaners that work on ceramic etch marble and other natural stone.
  • Silicone smears are lifted with a plastic blade, never a metal one on acrylic or enamel.
  • Protective film should come off soon. Left in the Mauritian sun, its adhesive bakes on and becomes much harder to remove.

When to book it

Book it after every trade has finished, including the electrician, the plumber and the painter’s touch ups. Book it before the furniture, curtains and rugs come in, since dust settles into fabric. Power and water should be connected, the debris and offcuts cleared and the skip gone. If the handover date is fixed, leave a day or two between the end of the works and the clean, while the last dust settles.

A price before you book

The price follows the number of bedrooms, and whether the property is empty or already furnished. Set them in the quote builder and you see it straight away, one bathroom (two from four bedrooms) and the windows included. Rubble and offcuts left on site are not part of the clean; we quote taking them away separately. For several units, send us the list on WhatsApp. See post construction cleaning for more.

Before the keys change hands

After the post construction clean, a deep clean or window cleaning before handover gets the property ready for the people moving in. Fine dust can keep appearing for a few weeks, especially from air conditioning units that ran during the works. It helps to have the units serviced before the new owners settle in. Our post construction guide covers the clean in more detail.

Request a quote in the booking tool below, or send us the address on WhatsApp.

Book now

Build your quote in seconds. The price you see is the price we charge.

Our quotation builder

Choose a cleaning service or book add-on care on its own. See your price in seconds.

Frequency
Add-on services
Base priceRs 3,500
Your priceRs 3,150

Your quotation

    No WhatsApp? We can call you

    What our clients say

    • “Every room was cleaned meticulously.”

      Mervin S., Google review
    • “A very attentive team.”

      Patricia F., Google review
    • “Customer service is impeccable.”

      Tatiana F., Google review

    Questions

    Short answers to what we are asked most.

    How is post construction cleaning priced?

    By the number of bedrooms, from a fixed table, and whether the property is empty or furnished. One bathroom is included, or two from four bedrooms, and the quote builder shows the exact price before you book. Taking away large debris is quoted on request.

    When should it be booked?

    After every trade has finished, including the painter's touch ups, and before the furniture comes in, with power and water connected.

    What should be done before you arrive?

    The last debris and offcuts cleared, the skip gone, and power and water connected. If the handover date is fixed, leave a day or two between the end of the works and the clean, while the last dust settles.

    Why does the dust keep coming back?

    Building dust is very fine, stays in the air and settles again, and hides in vents and tracks. That is why the work goes from the top down and the floors are done last.

    Can you remove paint and cement haze without damaging new finishes?

    We remove them with the method each surface needs. Paint comes off with a glass scraper held flat on wet glass, and silicone on acrylic or enamel with a plastic blade. Cement haze takes a product matched to the tile, since acid cleaners etch marble and natural stone.

    Is a post construction clean the same as a deep clean?

    No. A post construction clean removes building dust and the residues the trades leave, such as paint, cement haze, adhesive and film. A deep clean reaches the build up in a home that is lived in. Some properties have both, the deep clean just before handover.

    Are the kitchen, terrace and garden included?

    The kitchen is included. The garden is not. A terrace, balcony, garage, pavement or backyard can be added at a fixed price.

    Other industries we serve

    The same team, the same standard and fixed prices.